AMF-14H Maranda SN:1026 Construction Log

Posted by Roger in AMF 14H Maranda SN1026, news

1/30/2007:
It was a busy day. I only had time to rip some strips of 3/16 inch thick plywood to use on the rib jig. I put the strips and my mitre saw in the basement where I will be building the jig and the ribs.

1/31/2007:
The T-88 arrived! Quite a difference from ordering the spruce. Spruce needs a lot of lead time, so I will need to get the next order ready when I start assembling the ribs.

I got some time to work on the rib jig. The top and bottom stringers, nose block and tail block are in place. The next item will be the vertical rib members, then the diagonals.